Delta 48313 Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 78
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
E.
F.
Slide O-ring (1) over cartridge and the
bonnet nut (2). The O-ring, which acts as
a spacer to steady the sleeve, should rest
behind the bonnet nut.
Slide the sleeve (1) over the cartridge,
body and O-ring. Ensure sleeve is properly
positioned over the front of cartridge.
18 Series Installation - Single Unit
1
2
1
For back to back or reverse installations
(hot on right and cold on left): Rotate
cartridge (1) so the words “HOT SIDE” (2)
appear on the right. Install the cartridge
Back to back Installation
Reverse
Installation
Cold
Hot
1
3
making sure that the key is fully engaged
with the slot in the brass body (see step D).
Slide bonnet nut (3) over the cartridge and
thread onto the body. Hand tighten securely.
Cartridge Installation
10
2
Normal Installation
(changes not required)
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 77 78

Comentários a estes Manuais

Sem comentários